您好,欢迎来到爱学范文!

当前位置:爱学范文网>>合同范文>>英文技术服务合同范本

英文技术服务合同范本

标签:
时间:

英文技术服务合同范本

导语:技术服务合同是指当事人一方以技术知识为另一方解决特定技术问题所订立的合同。下面小编分享英文技术服务合同范本,欢迎参考!

Contract No.:________________________.

Date of Signature:____________________.

Place of Signature:____________________.

This Contract is made and entered into through friendly negotiation by and between China____________________ (hereinafter referred to as “Client”), as one party, and____________________ (hereinafter referred to as“Consultant”),as the other party, concerning the technical consultancy service of__________, under the following terms and conditions:

Article 1 Contents of Technical Consultancy Service

1.1 Whereas Client desires to obtain the technical consultancy service of from Consultant and Consultant has agreed to perform such services.

1.2 The Scope of Technical Services is defined in Appendix 1.

1.3 The Time Schedule for the Services is shown in Appendix 2.

1.4 The Manning Schedule is described in Appendix 3.

1.5 Consultant shall complete the Services within__________months from the Effective Date of this Contract and furnish the final technical service report, including drawings, designing documents, all kinds of standards and photos, within____months. Consultant shall keep aware, free of charge, Client of the latest development of similar projects and any progress made in order to improve the designing of the project.

Article 2 Both Parties' Responsibility and Liability

2.1 Client shall furnish to Consultant the pertinent data, technical service reports, maps and information available to him and shall give to Consultant the reasonable assistance necessary for carrying out of his duties. Particularly Client shall nominate a general representative who shall be available at reasonable time.

2.2 Client shall assist Consultant with the responsible authorities for obtaining visas, work permits and other documents required by Consultant to enter the country and to have access to the Site of the Project. The above expenses shall be borne by Consultant.

2.3 Consultant shall furnish a sufficient number of competent personnel to perform its obligation hereunder, in addition to those personnel specifically listed in Appendix 3. All personnel employed by Consultant in carrying out the work shall be exclusively Consultant's responsibility, and Consultant shall hold Client harmless from any claims of any kind by Consultant's personnel arising out of any acts by Consultant or its personnel in connection with the work performed hereunder.

2.4 Consultant shall provide Client all the technical technical service reports and relevant documentation within the Scope of Technical Services and within the Time Schedule of the Time Schedule for the Services.

2.5 Consultant shall assist Client'S personnel in his country in obtaining visas and in arranging lodgings. Hotel and boarding expenses shall be borne by Client. Consultant shall supply to Client'S personnel office space and necessary facilities as well as transportation.

2.6 Consultant shall be responsible for and shall indemnify Client and his employee in respect of injury to person or damage to property occurring in connection with the services, to the extent that such damage or injury directly results from negligence of Consultant's personnel while engaged in activities under this Contract.Consultant shall be liable only to the work under this Contract.

2.7 Any and all liability of Consultant with respect to this Contract shall be limited to the Total Contract Price received by Consultant for his profession services and shall terminate upon expiration of the warranty period set forth in Article 7.3.

Article 3 Price and Payment

3.1 The total contract price is__________(say __________________only) in________(currency). The breakdown prices of the above mentioned total contract price are as follows:

Contract Price for Item 1: ______(say ____________only) in________ (currency); Contract Price for Item 2: ______(say ____________only) in________ (currency); Contract Price for Item 3: ______(say ____________only) in________ (currency); Contract Price for Item 4: ______(say ____________only) in________ (currency).

3.2 The total contract price will include all the service and technology provided by Consultant. The total contract price shall be firm and fixed and shall not fluctuate with any inflation. The total contract price shall include all charges and expenses incurred by Consultant in performing his obligations both in his own country and in the People's Republic of China and includes the expenses incurred in sending the Technical Documentation to Client's office by all kinds of forms.

In the event of Force Majeure as defined in the Contract, the total contract price shall be readjusted through friendly negotiations between the parties. If Client requires services not contemplated in the Scope of Services the parties shall friendly discuss an amendment to the

total contract price. Any such amendment shall be in writing countersigned by both parties. This document shall then form integral part of the Contract.

3.3 All payments to be made by Client to Consultant under the present Contract shall be made by telegraphic transfer. In case of any payment by Client, the payment shall be effected through__________in China to _________ for the account of Consultant.

In consideration for the services provided by Consultant hereunder, Client shall effect the payment to Consultant in accordance with the following manner and percentage:

3.3.1 _______ percent (________ %) of the total contract price, i.e._____________ (Say: ________ only), shall be paid by Client to Consultant within ________ (____) days after the client has received the following documents provided by Consultant and found them in order.

A. One (1) original and two (2) duplicate copies of Consultant's government approval, or a written statement of the competent authorities or relevant agency of Consultant's country certifying that such document is not required;

B. One (1) original and one (1) duplicate copy of Irrevocable Letter of Guarantee for advance payment issued by Consultant's Bank in favor of Client covering_______(Say:________ only), specimen of which is as per Appendix 4;

C. Five (5) copies of profoma invoice covering the total contract price;

D. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

E. Two (2) copies of sight draft.

The said shall be delivered by Consultant not later than ____days after the effective date of the ________present Contract.

3.3.2 ________percent (____%) of the Contract price for Item 1, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

A. Ten (10) copies of technical service report on Item 1;

B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

C. Two (2) copies of sight draft.

3.3.3 ________ percent (____%) of the Contract price for Item 2, i.e. ___________ (Say: ____________ only) shall be paid by Client to Consultant within ________ (___) days after Licensee has received the following documents provided by Consultant and found themin order.

A. Ten (10) copies of technical service report on Item 1;

B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

C. Two (2) copies of sight draft.

3.3.4 ________percent (____%) of the Contract price for Item 3, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

A. Ten (10) copies of technical service report on Item 1;

B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

C. Two (2) copies of sight draft.

3.3.5 ________percent (____%) of the Contract price for Item 4, i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

A. Ten (10) copies of technical service report on Item 1;

B. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

C. Two (2) copies of sight draft.

3.3.6 ________percent (____%) of the Total Contract price , i.e._________ (Say: __________ only) shall be paid by Client to Consultant within _____ (__) days after Consultant has received the following documents provided by Consultant and found them in order.

A. Five (5) copies of manually signed commercial invoice indicating the amount to be paid;

B. Two (2) copies of sight draft.

3.4 In case Consultant is liable for paying to Client the penalty under the Contract, Client shall have the right to deduct it from any said payment.

3.5 The banking charges of both parties incurred in China for the execution of the Contract shall be borne by Client and those incurred outside China shall be borne by Consultant.

Article 4 Delivery Schedule

4.1 The deadline for the arrival of the Technical service reports CIF _____ are:

A. Technical service report on Item 1 : _________months after effectiveness of the Contract;

B. Technical service report on Item 2 : _________months after effectiveness of the Contract;

C. Technical service report on Item 3 : _________months after effectiveness of the Contract;

D. Technical service report on Item 4 : ________months after effectiveness of the Contract.

4.2 Consultant will inform Client by Fax when the Technical service reports are airmailed to Client indicating the date and number of airway bill. Client will inform Consultant when the Technical service reports have been received.

4.3 Should any document be missing or damaged during the transport Consultant shall be notified accordingly and within two (2) weeks the missing or damaged document shall be replaced by Consultant free of charge.

Article 5 Confidentiality

5.1 All data assembled, developed, compiled, reproduced, studied, and prepared in connection with the work done hereunder and furnished to Consultant by Client shall be considered confidential and shall not be divulged to any person, firm or corporation other than Client or its designated representatives. This Clause shall remain binding on Consultant notwithstanding the termination of the Contract for any reason.

5.2 Within the validity period of Contract, Both parties shall take proper measures to keep the materials or information strictly confidential. The other party shall not disclose or divulge to any third party without prior written consent of one party.

5.3 Either party shall be obliged to keep confidential any secret information of the other party which either party and its personnel may obtain or be accessible to in the course of the performance of Contract. Either party shall not make use of or disclose such secret information obtained from the other party without prior written permission issued by the other party.

Article 6 Taxes and Duties

6.1 All taxes and duties in connection with and in the execution of Contract levied by the Chinese government on Client in accordance with the tax laws of PRC shall be borne by Client.

6.2 All taxes and duties levied by the Chinese government on Consultant, in connection with and in the execution of Contract, according to Chinese tax laws and the agreement between the government of PRC and the government of Consultant's country for the reciprocal avoidance of double taxation and the prevention of fiscal evasion with respect to taxes on income shall be borne by Consultant.

Client is legally obliged to withhold, as a withholding agent, the amount of taxes pro rata each taxable payment under Contract and pay them to the relevant Chinese tax authorities. After receiving the tax receipts issued by the relevant Chinese tax authorities for the aforesaid withholding taxes, Client shall forward them to Consultant without undue delay.

6.3 All taxes and duties arising outside PRC in connection with and in the execution of Contract shall be borne by Consultant.

Article 7 Warranty

7.1 Consultant warrants that he has the experience and capability to efficiently and expeditiously perform the services in a satisfactory manner and that the services performed by him under this Contract shall be performed by competent personnel in accordance with accepted standards.

7.2 In the event of a failure of Consultant to provide to Client satisfactory services within the scope of work described in Appendix at any time for any reason within the control of the Consultant, Client may notify Consultant of such dissatisfaction. Consultant shall be afforded a period of days to correct or remedy the matter. Should Consultant within the time afforded by Client fail to correct or remedy the matter to the satisfaction of Client, all charges shall cease forthwith until such time as Consultant is able to provide satisfactory services in accordance with the Scope of work described in Appendix.

7.3 Consultant guarantees to Client that he shall, after receipt of notice from Client, promptly correct at no cost any errors in the services arising out of the negligent performance thereof.

Article 8 Ownership of Technical Service Reports

8.1 Final version of the technical service report submitted to Client and all relevant data such as maps, plans and supporting material compiled in performing the Scope of Services, shall be the property of Client. Such materials shall be sorted and indexed by Consultant prior to transmission to Client.

8.2 Consultant shall be permitted to retain copies thereof, provided however that such materials, including the material furnished by Client as stated in Article 5 of this Contract, shall not be used by Consultant for purposes not related with this Project without the prior written approval of Client.

Article 9 Assignment

9.1 Neither Client nor Consultant shall assign or sublet their rights or obligations hereunder without the prior written consent of the other party.

Article 10 Termination

10.1 If, due to the responsibility of Consultant, the technical service reports have not been delivered at dates according to the delivery schedules as stipulated in Article 4 of the Contract, Consultant shall be obliged to pay to Client penalty for such delay in delivery at the following rates:

A. ______ percent (____%) of the total contract price per week for the first four weeks;

B. _____ percent (____%) of the total contract price per week from the fifth week to the eighth week;

C. ______ percent (____%) of the total contract price per week from the ninth week of delay.

Odd days less than one (1) week shall be counted as one (1) week for calculating the liquidated damage.

10.2 The total liquidated damage for late delivery shall not exceed ______ percent (____%) of the total contract price. Payment of the liquidated damage for late delivery shall not release

Consultant from its obligation to deliver technical service reports.

10.3 Client may, without prejudice to any other remedy for Consultant's following breach of Contract, terminate Contract in whole or in part by a written notice of default send to Consultant, if Consultant

A. Fails to deliver any or all of technical service reports within______(____) days after the scheduled delivery date as specified in Article 1; or

B. Fails to make the technical service reports meet the minimum level of Acceptance Standards as specified in Appendix 1.

Consultant shall refund to Client all the payments effected by Client to Consultant plus an interest at the rate of______ percent (____%) per annum in case of such a termination.

10.4 Either party may, without prejudice to any other remedy, terminate Contract in whole or in part by a written notice send to the other party, if the other party.

A. fails to perform its confidentiality obligation under Contract; or

B. fails to perform any other obligations under Contract except minor parts thereof, and does not remedy for its failure within a period of______ (____) days upon receipt of the written notice or a period agreed upon between the parties; or

C. becomes bankrupt or insolvent; or

D.Affected by any event of Force Majeure for more than ______ days.

Article 11 Force Majeure

11.1 Should either party be prevented from performing any of its obligations under Contract due to event of Force Majeure, such as war, serious fire, typhoon, earthquake, flood and any other events which could not be expected, avoided and overcome, the affected party shall notify the other party of its occurrence by fax and send by registered airmail a certificate issued by the competent authorities or agency within fourteen (14) days following its occurrence.

11.2 The affected party shall not be liable for any delay or failure in performing any or all of its obligations due to the event of Force Majeure. However, the affected party shall inform the other party by fax the termination or elimination of the event of Force Majeure without delay.

11.3 Both parties shall proceed with their obligations immediately after the cease of the event of Force Majeure or removal of the effects. The validity period of Contract and/or the scheduled period for relative execution of Contract shall be extended correspondingly.

Article 12 Arbitration

12.1 Any dispute arising from or in connection with this Contract shall be submitted to China International Economic and Trade Arbitration Commission,Shenzhen Commission for arbitration in accordance with the Commission's arbitration rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties and the applicable law is the material law of P.R.C.

12.2 Notwithstanding any reference to arbitration, both Parties shall continue to perform their respective obligations under the Contract unless otherwise agreed.

Article 13 Language and Standards

13.1 Correspondance except this Contract between Client and Consultant, data and documents made available by Client to Consultant and the technical service reports and drawings prepared by Consultant shall be in the English language.

13.2 Measures shall be written in the metric system.

Article 14 Governing Law

14.1 The construction, validity and performance of this Contract shall be governed by the laws of the People's Republic of China.

Chapter 15 Effectiveness of the Contract and Miscellaneous

15.1 Both parties shall make effort to obtain the approval from the respective authorities, if necessary, within thirty (30) days after Contract is signed by the authorized representatives of the two parties. Either Party shall notify in writing the other party of the approval date. The later date of approval shall be taken as the Date of Effectiveness of Contract.

15.2 Contract shall be valid and remain in force for_______(____) years from the Date of Effectiveness.

15.3 The outstanding credit and debt between the parties under Contract shall not be affected upon the termination or expiration of Contract.

15.4 Appendices hereof shall be integral parts of Contract and have the same legal force as the text of Contract itself. The text of Contract shall prevail in case of any discrepancies between the text of Contract and Appendices.

15.5 All amendments, supplements, subtractions, or alterations to Contract shall be made in writ

推荐阅读:

    想了解更多合同范文的资讯,请访问:合同范文
    下载文档

    看过《英文技术服务合同范本》的人还看了以下文章

    延伸阅读

    面对高考需要制定一份详实的备考计划,包括了解命题趋势,把握复习方向、加强薄弱环节,突出重中之重、构建知识网络结构,注重知识交汇点的复习等方面。下面是爱学范文网小编为大家收集整理的2022年高考备考计划

    师德师风教育演讲稿:幼儿教师篇我骄傲——我是幼儿教师当我一次次看着初升的太阳,一次次看见花儿娇艳的笑脸,一次次听着小鸟的纵情歌唱,我为我是名幼儿园教师感到骄傲和自豪,我为选择了这份太阳底下光辉的神圣职

    辅导员学期工作总结  20xx年即将过去,回首这一年,本人工作取得了一定的成绩,同时也存在一些缺点。担任辅导员工作,我感到责任重大。现将本学期辅导员工作从一下三个方面总结如下:  一、班级管理

    主题班会设计要以学生为中心,综合考虑班级发展情况,针对班级管理情况开展有意义的主题班会,下面是小编整合的学生安全主题教育班会策划方案,一起来看看吧,肯定对你有所帮助的。

    无论从事哪个行业,总有疲惫的时候,想要离职了,就需要先递交一份辞职报告申请,那有这想法的朋友们知道辞职报告是怎么写的吗?下面是小编为大家带来的有关员工辞职报告书简洁版全新【5篇】,希望大家喜欢。

    班主任工作在学校教育活动中有着举足轻重的作用。那么大家知道初一班主任下学期工作总结怎么写吗?以下是本站小编为您整理的“初一班主任下学期工作总结范文”,供您参考,更多详细内容请点击本站(www.liux

    主题活动指:在集体性活动中,以一个主题为线索,围绕主题进行活动与交流。爱学范文今天为大家精心准备了防溺水主题活动,希望对大家有所帮助!防溺水主题活动  1、初步了解溺水安全的有关内容,要求每一个学生

    实施方案是指对某项工作,从目标要求、工作内容、方式方法及工作步骤等做出全面、具体而又明确安排的计划类文书,是应用写作的一种文体。惠好考试网以下是小编收集整理的医院扫黑除恶专项斗争工作实施方案范文(精选

    厨师自我鉴定15篇自我鉴定即为自我总结,自我鉴定可以总结以往思想,发扬成绩,因此我们要做好总结,写好自我鉴定。自我鉴定怎么写才不会流于形式呢?下面是小编精心整理的厨师自我鉴定,希望能够帮助到大家。厨师

    事故(Accident),一般是指当事人违反法律法规或由疏忽失误造成的意外死亡、疾病、伤害、损坏或者其他严重损失的情况,如交通事故、生产事故、医疗事故、自伤事故。本站今天为大家精心准备了安全生产心得